Publication Search:


Browse by Keyword:
230 KV Strain Bus System
A.C. Corona
Disconnect Switch
EHV Insulator
EHV Generator Step-up
HV Equipment
Leda Clay
NPV
PD
PD Locating
PD Location
RCM
Risk-based
SF6
SF6 Decomposition Products
SF6 Insulated Substations
SF6 Substation
SF6 Substations
Acceptance
Advanced
Advanced Model
Advanced Models
Advanced Program
Aged
Aged Assets
Analysis
Analytical Methods
Anchor Systems
Anchored Foundations
Anomalies
Application
Application In Monitoging
Applications
Arc Resistance
Assessment
Asset
Asset Condition Assessment
Asset Management
Asset Management Planner
Asymmetry Resonance
Augured Footing
Augured Footings
Backfilling
Behavior
Benchmarking
Blending Into Environment
Bundled Conductors
Burn-through
Bus Response
Bushings
Business Performance Improvement
Cable Backfill
Cable Size
Cable Sizes Optimization
Cables
Capacitive Current
Capacitor Bank
Circuit
Circuit Breaker
Circuit Breakers
Classification
Clay
Climate
Coaxial Cylindrical Geometry
Commissioning
Condition Assessment
Condition Monitoring
Core Vibrations
Coupling Devices
Criteria
Criteria For EOL
Current Transformers
Data Interpratation
Data Issues
Decision Making
Decision Support
Deep Augured Footings
Description
Design
Design Optimization
Detection Of Partial Discharge
Dga
Diagnostic Techniques
Diagnostics
Distribution Assets
Distribution System
Distribution System Application
Drilled Piers
Economic Selection
Electric Shock
Electrical Equipment
Electrical Insulation
Emission
End Of Life
End Of Life Decision
End-of-life
Equipment
Equipment Monitoring
Estimation
Experimental Studies
Fault Locating
Fault-produced Overvoltages
Field Test
Field Testing
Financial Model
Fissured Clay
Fleet Management
Footings
Formulation
Foundation
Gas
Gas Insulated Equipment
Gas Insulated Substations
Gas-Insulated Substations
Gas-insulated
Gas-insulated Stations
Gas-insulated Transmission Equipment
Generic Guidelines
Geotechnical Engineering
Gis
Glacial Till
Greenhouse
Grounded Enclosures
Grounding
Grounding Hazard
Grounding Hazards
Grounding Practices
Guide
Guidelines
Guides
Guides For Transformers
Handling Of SF6
Harmonics Interactions
Hazard
Hazard Management
Hazard Rate
Hazard Rate Function
Hazard Zone
Helical Plate Anchors
High Fault Current
High Short-circuit Current
High Tech Electronics
High-voltage Transmission Cables
Highly Stressed Volumes
Hot-spot Remedial System
Humidity
Improved Reliability
Improverment
Increased Ratings
Independent Review
Innovative Analysis
Insulating Oil
Internal Winding Stress
Investigations
Lateral Capacity
Laterally Loaded Piers
Life Cycle Management
Life Estimation
Lightning Arresters
Line
Load Tap Changer
Load Tap Changers
Loading
Log Periodic Dipole Antennas
Log-periodic Dipole Antennas
Long-term
Ltc
Maintainability
Maintenance
Maintenance Optimization
Maintenance Planning Advisor
Maintenance Policies
Management
Measurement Of Pulses
Measuring Instrument
Mechanical Aspects
Mechanical Effects
Mechanical Resistance
Metalclad Switchgear
Method
Methodology
Methodology For Selecting
Model
Moisture
Monitoring
Monitoring And Diagnostics
Multi Criteria
Non-uniform Thermal Environment
Oil Circuit Breaker
Oil Circuit Breakers
Oil Dielectrics
Oil Testing
Oil-filled Transformers
On-line Condition Monitoring
Online Partial Discharge
Operating
Optimization
Partial Discharge
Partially Saturated Soils
Performance
Performance Of Direct Embedment Poles
Periodic Non-uniformity
Personnel
Planning
Point-to-point Geometries
Position Paper
Power Equipment
Power Transformers
Practical Asset Management
Prediction
Probabilisitic Analsyis
Probabilistic
Probabilistic Analysis
Probabilistic Approach
Probabilistic Assessment
Probabilistic Methods
Probabilistic Model
Probabilistic Short-circuit Analysis
Probabilistic Short-circuit Design
Probabilistic Uprating
Probability
Problem Identification
Problem Mitigation
Process For Dealing With Power Transformer Manufacturers On Short-circuit Issues
Public
Pulse Characteristics
Rating
Refurbishment
Reliability
Reliability And Maintainability Requirements
Reliability Centered Maintenance
Remaining Life
Replacement Criteria
Requirements And Test Codes
Requirements On Tender Evaluation
Review Of Experience
Rigid Bus
Risk
Risk Assessment
Risk Assessment Methods
Risk Model
Risk Quantification
Risk-based Method
Risk-based Methods
Rotating Machines
Safety
Sand
Security
Shear And Moment Loads
Shock Hazard
Short Circuit
Short Circuit Current
Short Circuit Design
Short-circuit
Short-circuit Capacity
Short-circuit Current
Short-circuit Design For Power Transformers
Short-circuit Studies
Soil
Soil And Rock Anchors
Soil Thermal Resistivity
Soils
Standards
State Of The Art Review
Station
Station Liquid-filled Power Transformers
Step And Touch Potentials
Stiff Fssured Clay
Strain Bus
Strain Bus System
Strategy
Studies
Substation
Substation Automation
Substation Bus
Substation Bus Design
Substation Bus Systems
Substation Equipment
Substation Nuses
Substations
Summary
Survey
Switchgear
Switching
Swtichgear
Swtiching Equipment
Tap-changer
Temporary Grounding Cables
Testing
Thermal Design
Thermal Instability
Thermal Stability
Transformer
Transformer Applications
Transformer Factory Testing
Transformer Failure
Transformer Field Testing
Transformer Fleet
Transformer Installation
Transformer Installation And Commissioning
Transformer Life
Transformer Life Extension.
Transformer Loading And Monitoring
Transformer Specifications
Transformers
Transient Ground Potential Rise
Transient Groundrise
Transient High Voltage
Transient High Voltages
Transmission
Transmission And Distribution
Transmission Line Structures
Transmission Tower
Transmission Tower Foundations
Transmission Towers
Transmisssion
Transparent Medium
Tubular Bus
Undeground Cable
Underground Cable
Underground Cable Design
Underground Cables
Underground Transmission Systems
Upgrading
Uplift
Uplift And Compression Behaviour
Uplift Capacity
Uplift Design
User Friendly Computer Program
User-friendly Software
Utility
Utilization
Vehicle
Volume Change Characteristics
Weather Dependent Processes
Workshop
Workstation

Publications List

Your search for guide resulted in 4 publications.

Short-Circuit Design Requirements for Power Transformers

Authors: J. Lackey, M. Vainberg
Publication: (CEATI Report T074700-3048)
Date: 2008
Keywords: description, summary, short-circuit design for power transformers, generic guidelines, process for dealing with power transformer manufacturers on short-circuit Issues

User Guide For The Application Of Monitoring And Diagnostic Techniques For Switching Equipment For Rated Voltages Of 72.5 kV And Above

Authors: W.J. Bergman et al
Publication: CIGRE Publication 167; WG 13.09
Date: August 2000
Keywords: guide, monitoring and diagnostics, swtiching equipment, circuit breakers

Guidelines for Design of User-Friendly Software

Authors: M. Vainberg
Publication: CEA Project SD-235, CEA
Date: June 1992
Keywords: guidelines, design, user-friendly software