An innovative and responsible self-starter with extensive experience and technical skills in forensic analysis, design, repair and maintenance in the power transformer industry. Proven strengths include problem solving and customer focus. Gary is a results-driven specialist with the ability to work effectively in a team environment.
View Extended CV
Experience
2005 - Present
Expert Transformer Specialist, PowerNex Associates Inc.
Provision of wide range of transformer consulting services, including forensic analysis and investigation of transformer failures, review of designs, etc.
2000 - 2005
Transformer Specialist, Siemens Canada
Responsible for design of new and repair of failed transformers. The range of transformer ratings was 3 MVA to 750 MVA
- Designed a hot oil spray vacuum tank. The new tank allowed the plant to bid on and handle larger transformers. The new tank reduced costs and reduced cycle times from 14 days to 5 days.
- Designed and installed a new 10 MVA Rectifying transformer unit as an exact duplicate of an old existing unit, saving costs associated with redesigning existing substation setup for Alcan Smelters in Kitimat B.C.
- Designed and led service technicians in the replacement of underload tapchanger gear on a 50 MVA transformer. Saved approximately $150K in shipping cost. Lasco Steel, Whitby, Ontario.
- Led and directed the repair of two essential 192 MVA/262 MVA transformers that suffered shipping damage. Met customer’s time restraints. First Energy Corp., Pittsburgh.
1995 - 2000
Central Engineering Group – Transformer Specialist, Siemens/Westinghouse
- Responsible in assisting 23 field and service plant operations with transformer engineering
- Interpreted transformer gas-in-oil results samples and generated reports for customers on the condition of the customer’s transformer. Reports would indicate possible corrective action required. Approximately 2000 samples per year.
- Identified and sourced all transformer replacement parts, including sourcing best prices, quality and delivery time.
- Interfaced with customers, defined needs and scope of work required, prepared material and labour quotes.
1963 - 2000
Westinghouse Service DivisionWestinghouse Canada Ltd
Field Service Installer, (1992 - 2000) Responsible for installation of transformers for Westinghouse (TTI) in North America.
- Led and organized 8 field service representatives in the repair of two, 400 MVA transformers at customer’s location. Saving approximately $300K shipping cost. Each project was accomplished in a 29 days. Sheerness Generating Station, AB
- Installed 110 MVAR Reactor with acoustic enclosure. Salt River Project, Phoenix, Arizona
TransElectric Incorporated Technology(Owned by Westinghouse) (1989 – 1992)
Product Service Specialist
Responsible for customer service and warranty.
Westinghouse
Factory Engineer 1985-1989
Responsible for the assembly and building of large power transformers 30 MVA up to 750 MVA.
Westinghouse Canada Ltd.
Large Power Engineering Dept. (1963-1985)
- Group Leader
- Layout Specialist
- Detailer
Education
Mohawk College
Graduated secondary school as a mechanical draftsman.
View Publications